Monday, June 26, 2006

Day 41

Plenty of work was done today, but none of it is really picture worthy.

The roofers put in a full day, and got about 50% of it done. Which means they should be at 100% tomorrow, just as long as the rain misses us.

The electricians were pretty busy too. They ran all the outlet and switch wiring, tv and phone cable, and the CAT5. They don't have it wired up to the box in the basement, but since tomorrow is their last day, I'm gonna assume that will be done by the end of the day.

The plumbers got both showers mounted and got all the drainage PVC pipe put in for the 1st floor sinks, showers and toilets. It looks like the only thing they have left to do, is to run the pipe for water. I'll be interested to see if they run copper, or the "new and improved" nylon pipe that is supposed to be better then copper. The good thing about nylon is that it won't break when water freezes in it.

They still haven't put in those final 2 basement windows yet, which is a little baffling. I'd really like it if they got those in soon, so the siding could start.

1 comment:

Anonymous said...

I didn't realize you were putting in CAT5, but I'm not surprised. Either way, that rules.