Tuesday, June 13, 2006

Day 28

I was right. First floor framing started today. They got most of the garage done, as well as the entire back wall.


The picture below shows the house from the back. They even managed to put Tyvek wrap up on the exterior wall. You see the two big openings on the left hand side of the house? The bottom one is our walk out sliding glass door from the basement. Right above that is the walk out slider that comes out to the deck. The other openings along those walls are windows.


The roof rafters were sitting out front too. I think that's a pretty good sign for things to come this week.

No comments: