They pretty much cleared out 80% of what was in the garage. They got all the cabinets installed in the kitchen, bathrooms, and trimmed every single doorway in the entire house. This is the kitchen and the center island:


The fireplace was looking good.


...and as of 6:30 pm they were still working on the siding. They were 1/2 done with the back of the house and it didn't look like they were going to be quitting anytime soon.